ECC · Plant layoutLINE 01 / 16
Entrance & ProjectOn site · Project start: empty site

Line 01 / 16

Entrance & Project

Security gate, office building and car park. Everything starts here, with the layout plan and the production flow.

  • ECC here:
  • Engineering Services
  • Site Management
Goods ReceivingOn site · Dock and arriving truck

Line 02 / 16

Goods Receiving

Steel coils and parts arrive at the loading docks and are placed in storage with overhead cranes.

  • ECC here:
  • Machinery Relocation
  • Plant Installation
On site · Transfer press line

Line 03 / 16

Press Lines

Presses weighing many tonnes are lowered onto their foundations by crane, dies are fitted and the line makes its first stroke.

  • ECC here:
  • Machinery Relocation
  • Plant Installation
Welding CellsOn site · Robotic welding cell

Line 04 / 16

Welding Cells

Robotic welding cells, two-axis positioners and fume extraction. Steel structures are joined in precision fixtures.

  • ECC here:
  • Plant Installation
  • Production Optimisation
On site · Overhead conveyor and powder booth

Line 05 / 16

Surface Treatment & Paint Shop

Pre-treatment, paint booths and curing ovens; an overhead conveyor carries parts along the line, and ducts and process piping are installed together.

  • ECC here:
  • Plant Installation
  • Process Piping
On site · Assembly station

Line 06 / 16

Assembly Line

Products travel on a pallet conveyor and are completed at operator stations: an ergonomic line equipped with torque tools, parts racks and screens.

  • ECC here:
  • Plant Installation
  • Production Optimisation
Automation CellsOn site · KUKA palletising robot

Line 07 / 16

Automation Cells

Robots, turntables, sensors and safety fencing. We combine mechanical installation with automation integration.

  • ECC here:
  • Engineering Services
  • Production Optimisation
Quality Control & TestingOn site · Metrology lab

Line 08 / 16

Quality Control & Testing

Metrology room, vision inspection station and function test stands. Every product is verified before it leaves the line.

  • ECC here:
  • Engineering Services
  • Production Optimisation
On site · CNC machining centres

Line 09 / 16

Maintenance Shop & Tool Room

Machine tools, CNC machines and a die maintenance area keep the line running without interruption.

  • ECC here:
  • Maintenance & Service
  • Plant Installation
Lifts & MezzanineOn site · Goods lift and mezzanine

Line 10 / 16

Lifts & Mezzanine

The flow must not break between floors. Goods lifts, mezzanines and vertical conveying systems are installed safely.

  • ECC here:
  • Machinery Relocation
  • Plant Installation
WarehouseOn site · Racking aisle and forklift

Line 11 / 16

Warehouse

High-bay racking, forklifts and stock areas. Finished goods are stored in order and within quick reach.

  • ECC here:
  • Plant Installation
  • Site Management
On site · Pallet wrapping and dispatch line

Line 12 / 16

Packing & Shipping

Stretch wrapping, packing lines and loading docks. Products are loaded onto trucks and hit the road.

  • ECC here:
  • Machinery Relocation
  • Plant Installation
UtilitiesOn site · Water treatment and process tanks

Line 13 / 16

Utilities

Cooling towers, water treatment, compressor station and fire water tank: the unseen supporters of production.

  • ECC here:
  • Process Piping
  • Plant Installation
Power CentreOn site · Power transformers

Line 14 / 16

Power Centre

Substation, generators and distribution panels: safe, uninterrupted power for the plant.

  • ECC here:
  • Plant Installation
  • Maintenance & Service
Piping & Cable InfrastructureOn site · Process pipelines

Line 15 / 16

Piping & Cable Infrastructure

Process water, compressed air and cable trays run from the ceiling to every machine, connecting the plant's arteries.

  • ECC here:
  • Process Piping
  • Plant Installation
CommissioningOn site · Lines running

Line 16 / 16

Commissioning

The whole plant is tested together. Sensors, safety systems and cycle times are verified, and the signal towers turn green.

  • ECC here:
  • Production Optimisation
  • Maintenance & Service

Plant complete

Turnkey.

Final stop

Turnkey delivery.

From the first survey to the first product: one team, one schedule, one responsibility. You receive the keys and the plant is ready to produce. After commissioning, we stay with you for maintenance and service.

  1. 01Survey & engineeringSite measurement, layout plan, project and schedule
  2. 02Relocation & installationDismantling, transport, positioning and installation of machinery
  3. 03InfrastructureProcess piping, cable trays and utility connections
  4. 04Commissioning & serviceTesting, first production, planned maintenance and fast service
Completed turnkey plant
Turnkey · plant ready for production

References

25 industrial brands have trusted us with their production.

A. Fater
Viessmann
Toyotetsu
Serel
Sacmi
Riedhammer
Reno
Polinas
P&G
PepsiCo
Ora
Mubea
Maxion
A. Fater
Viessmann
Toyotetsu
Serel
Sacmi
Riedhammer
Reno
Polinas
P&G
PepsiCo
Ora
Mubea
Maxion
Mahle
La Lorraine
Gaiotto
Ferrero Fındık
Eczacıbaşı
ECA
CKE
Cevher Jant Sanayi
Berrmak
Beko
Ball
Aks Otomotiv
Mahle
La Lorraine
Gaiotto
Ferrero Fındık
Eczacıbaşı
ECA
CKE
Cevher Jant Sanayi
Berrmak
Beko
Ball
Aks Otomotiv
Follow us on LinkedIn

Let's talk about
your project.

Quote request

Tell us about your project, we'll get back to you.

Fill in the form and our engineering team will contact you within one business day.